Abu Dhabi DOT Bus no: Reg Bus 880-Runs between Ghayathi, Ghayathi Rd/Ghayathi Souq and Ruwais Mall
Where Abu Dhabi Bus number Reg Bus 880 Stops?
Abu Dhabi Bus number Reg Bus 880 stops at the below bus stops:
-
-
- Ruw Ruwais Mall
- Ruw Ruwais Camp Management
- Ruw McDonald’s
- R Zubair Bin Al Awam Mosque
- R ADNOC Compound-Hospital
- R Civil Project Division
- R 2 East Street
- Ruw Compound East Market
- Ruw Ruwais ADNOC-Bus Station
- Ruw Ruwais ADNOC-Bus Station
- Ruw Compound East Market
- R 2 East Street
- Ruw Central Bus Station
- Ruw Central Bus Station
- R Al Ruwais Park
- Gha Ghayathi Rd/Target Camp
- Gha Ghayathi Rd/ Workers City
- Gha Ghayathi Rd/Al Masood Bergum
- Gha Ghayathi Rd/Al Royum Company
- Gha Ghayathi Rd/GISCO labor camp
- Gha Ghayathi Rd/Al Ghabat Camp
- Gha Ghayathi Rd/Industrial Area
-
-
-
-
- Gha Ghayathi Road-Lulu Hypermarket
- Gha Ghayathi Road-Lulu Hypermarket
- Gha Al Tala-I’ /New Mubarak Shabiya R/A
- Gha Ghayathi Rd/New Police Station
- Gha Marabi’ Ghiyathi St/Mubarak Shabiya
- Gha Marabi’ Ghiyathi St/Sheikh Zayed Mosque
- Gha Al Diyafah St /Raisa Bin Khalfan Mosque
- Gha Ghayathi Rd/Mubarak Shabiya
- Gha Ghayathi Rd/Old Hospital
- Gha Ghayathi Rd/ Ghayathi Bus Station
- Gha Ghayathi Rd/ Ghayathi Bus Station
- Gha Ghayathi Rd/ADCS Super Market
- Gha Ghayathi Rd/Ghayathi Souq
- Gha Ghayathi Rd/Public Garden
- Gha Ghayathi Rd/Majlis Mubarak Bin Qaran
- Gha Ghayathi Rd/Al Dhafra Sports Club
- Gha Ghayathi Rd/Khalfan Mubarak Mosque
- Gha Ghayathi Rd/Al Dhafra Sports Club
- Gha Ghayathi Rd/Majlis Mubarak Bin Qaran
- Gha Ghayathi Rd/Public Garden
- Gha Ghayathi Rd/Ghayathi Souq
-
-
Features and Facilities of 880 Bus
-
-
-
- The bus is spotless and well maintained.
- The bus is fully equipped with the air conditioning that maintains the weather.
- Ample seating with categorization of the seats for seniors, pregnent women and people with disabilities.
- Reserved seats to fulfill the needs of the passengers.
- Free Wi-Fi service access that ensures the passenger’s enjoyment during the itinerary or in case the bus is delayed.
- An onboard display that shows the departure and arrival time.
- Real-time schedule tracking service by downloading the Darbi mobile app.
-
-
Integrated Transport Centre (ITC) Customer Care Contacts
View the Integrated Transport Centre (ITC) Customer Care Contacts through the above link.
View Reg Bus 880 Route Time Schedule
How much is the bus fare in Reg Bus 170?
-
-
-
- Approximate fare: AED 2 (per Trip)
-
-
Which is the first pick up /starting point for Reg Bus 880 – Bus Line / Route in Abu Dhabi?
Starts from Ruwais Mall and ends at Ghayathi.
Hafilat Card (Transport card) Abu Dhabi: How to apply, Bus trip / fare, How to report the lost card, Check status
Public transport services available for each Hafilat category include local city bus services, suburb bus services and intercity bus services from Abu Dhabi.
Hafilat Card Types
| Types | Fee (AED) | Valid |
| Contactless Smart Ticket CST (Temporary Use) | free | 30 days |
| Contactless Smart Card Anonymous CSC (Permanent Use) | 10 | 5 Years |
| Contactless Smart Card Personalised CSC (Permanent Use) | 10 | 6 Years |
| Contactless Smart Card Senior Citizen CSC | 5 | 7 Years |
| Contactless Smart Card Special Needs/Disabled CSC | 5 | 8 Years |
| Contactless Smart Card Students | 5 | 9 Years |
Public Transport Bus Fares
| Bus Services | Price (AED) |
| Local trips (inside the city) | 2 |
| Regional trips (suburbs) | 2 + 0.05 per kilometer. |
| Inter-city trips | 10 + 0.1 per kilometer |
| Hafilat Card Cost | 10 |
| Hafilat Card Weekly Pass | 30 |
| Hafilat Card Monthly Pass | 80 |
| Hafilat Senior Citizen/People of determination Pass | Free |
Is there any tourist bus available in Abu Dhabi?
-
-
-
- Yes available. Big Bus Tours offers sightseeing tours of Abu Dhabi on open-top double-decker buses, with pre-recorded commentary available in a choice of different languages. Rewrite this sentence.
-
-
Attractions / Filming / MBME Kiosk / Restaurants / Parks/ Supermarket near Al Raha Shopping Centre Abu Dhabi
| Al Raha Shopping Centre | LifeCare Hospital | Al Oshoush Village | Magenta Pearl Village 2 | Al Dh’oun St / Baniyas Court |
| Al Wa’i St / Maryam Bint Omran School | Bani Yas St / Souq | Bani Yas St / Taxi Station | Bani Yas St / Sadd Maareb Medical Center | Bani Yas St / Imam Ahmed Bin Hambal Mosque |
| E22 / Abu Dhabi University | Khaleej Al Arabi St / Bus Interchange | Sultan Bin Zayed St / Mohammed Bin Khalifa St | Sultan Bin Zayed St / Abu Dhabi Bus Station | Sultan Bin Zayed St / Mariam Bint Said Mosque |
| Sultan Bin Zayed St / Madinat Zayed Shopping Centre | Hamdan St / Ministry of Economy | Hamdan St / Emirates Tower | Hamdan St / Hazaa Bin Zayed Mosque | Al Zahiyah St / Al Diar Dana Hotel |
Got any question about Abu Dhabi DOT Bus No: Reg Bus 407 ? Contact Abu Dhabi DOT
Abu Dhabi DOT Contact phone number: +800850
DOT Email: customer.care@itc.gov.ae
Abu Dhabi DOT Fax: +97126359666
The Future of Transportation: Robot Taxis Coming to Abu Dhabi
View the Future of Transportation: Robot Taxis Coming to Abu Dhabi above link.

List of Bus Routes in Abu Dhabi, UAE
View the List of Bus Routes in Abu Dhabi, UAE through the above link.
Download Integrated Transport Centre (ITC) App from Google Play Store, Android/Apple store, mac, ios
Contact Integrated Transport Centre (ITC) on social media
Rate your experience with Reg Bus 880 in Abu Dhabi (click on the stars below)






